Equipment inspection
Every unit gets the right checklist automatically, matched to its make, model and size class. A Cat 336 and a Komatsu PC490 both open the standard excavator form. Fail a safety-critical item and the unit goes on hold.
Everything a construction fleet does, from the walk-around in the field to the cost posting on the job.
For operators, drivers, foremen and project leads. Works on any phone, with or without signal.
Every unit gets the right checklist automatically, matched to its make, model and size class. A Cat 336 and a Komatsu PC490 both open the standard excavator form. Fail a safety-critical item and the unit goes on hold.
Driver vehicle inspection reports for trucks and trailers, to 49 CFR 396.11. Safety defects must be repaired and certified before the unit moves. Lapsed registration, insurance or DOT dates take it out of service automatically.
Report a machine down with photos and a GPS pin. The assigned mechanic gets one text with the pin attached, and nothing else, so the texts stay read.
Request units by date and site. The equipment department fills from the yard or issues a rental purchase order, with periods, vendor terms and billing tracked to the job.
Every inspection and service call carries a location. Draw a geofence around a project and see which units are inside it, and where each has been.
Six record types are stored on the phone when there is no signal and sent when it returns. Equipment and project lists are cached, so the forms still fill with no network at all.
Nothing typed twice.
A defect found on a walk-around becomes a work order, a parts request and a cost posting without re-entry. A safety-critical defect also puts the unit on hold until it is repaired and cleared.
For mechanics, the equipment department and owners.
Open, assign, prioritize and close work orders. The mechanic schedule shows who is on what, where, and when parts are due in.
Mechanics request parts against a work order. Purchase orders print as documents. When parts are marked received, the mechanic waiting on them is texted.
Condition checks when a unit leaves the yard and when it comes back, so damage lands on the right job. Can be switched off per company.
A failed safety item puts the unit on hold. Clearing it takes a repair record, an operability attestation and a signature, and produces a clearance document.
Downtime by unit and cause, labor and cost postings to jobs, inspection and equipment analytics with drill-down, and Excel export of anything on screen.
Hour meters pull straight from your telematics account (Cat, Komatsu, Samsara and others), so service schedules and job costs update without anyone reading a gauge. Every unit carries its telematics ID, so nothing is matched by hand.
Equipment master, categories, custom fields, inspection templates, users and titles, company settings, and documents stored per unit.
English.
Español.
Same record.
Every screen, checklist and DVIR item in both languages, one tap apart.
Thirty minutes with your equipment list loaded. No slide deck.